Post-construction & builder's cleans

Post-construction cleaning proof that closes out the punch list.

Construction dust doesn't photograph itself. Document rough, final, and touch-up cleans with dated evidence the GC can forward straight to the owner, and get your invoice signed off without another site visit.

No signup · No credit card · Ready in under 2 minutes

Sound familiar?

The problem isn't the clean. It's proving it.

01

The GC's superintendent walks the site two days after your final clean, finds drywall dust from a trade who came back in, and holds your invoice hostage for a free re-clean.

02

Handover day slips, and by the time the owner walks through, your 'final clean' is a week old. Without dated photos, you can't separate your work from what happened since.

03

Payment applications need backup documentation. 'We cleaned it, trust us' doesn't survive the pay-app review. Line-item evidence does.

How it works

Three steps. One report per job.

No app, no training day. If your crew can take a photo, they can document the job in a report clients trust.

  1. 01

    Upload before & after photos

    Add them straight from your phone or camera roll, labeled before and after by area.

  2. 02

    Add the job details

    Site, client, crew, time on site, and the scope you completed, two minutes, tops.

  3. 03

    Download or send the report

    A clean, dated PDF you can send your client before you leave the site.

What your client sees

A receipt, not a promise.

Every report documents the scope you agreed to, photographed, dated, and signed off. Here's what a typical one covers:

  • Construction dust removed from all surfaces, ledges, and fixtures
  • Stickers, paint overspray, and adhesive removed from glass and hardware
  • Floors scrubbed, polished, or carpet-vacuumed to handover standard
  • Interior windows, tracks, and frames detailed
  • Debris and packaging removed; units left owner-ready
Proof-of-clean report

Elm & 5th, Building B, Floor 3

310 Elm Street, Austin, TX · Mar 14, 2026

Client
Marlowe Construction Group
Provider
Keystone Site Services
Crew
J. Nakamura, T. Boateng, L. Ferreira
On site
7:00 AM to 3:40 PM (8h 40m)
Photo evidence
4 items
Reception, beforeBefore
Reception, afterAfter
Restroom, afterAfter
Kitchenette, afterAfter
Work completed
5 items

Scope of work

  • Construction dust removed from all surfaces, ledges, and fixtures
  • Stickers, paint overspray, and adhesive removed from glass and hardware
  • Floors scrubbed, polished, or carpet-vacuumed to handover standard
  • Interior windows, tracks, and frames detailed
  • Debris and packaging removed; units left owner-ready
Timeline
  1. 7:00 AM

    Crew on site

  2. 3:40 PM

    Crew off site

Summary

0 photos attached

No photos attached

Time on site

7:00 AM to 3:40 PM · 8h 40m

Elm & 5th, Building B, Floor 3

310 Elm Street, Austin, TX

Client sign-off

Signature, to be completed on site

Questions we hear often

Can I attach the report to my payment application?+

Yes. Each report is a dated PDF with photo evidence, the scope completed, and crew time on site, the backup documentation pay-app reviewers actually want. Many subs attach one report per phase or per floor.

What if trades re-enter the site after my final clean?+

Your report documents the condition on the day you left. If a trade tracks dust through a finished unit afterward, the evidence shows the re-clean is a change order, not a warranty call.

Can I do separate reports for rough clean, final clean, and touch-up?+

Yes, generate a report per phase. GCs like this because it maps to how they schedule and release payment, and it protects you at each milestone independently.

Does it work on large sites with multiple crews?+

Reports capture which crew members were on site. Split large projects by floor, unit, or building so each area has its own clean chain of evidence.

Make your final clean the last word on the punch list.

Start with the free generator. Upgrade to send clean, unbranded reports.